**Winter 2014 Trip to Isongo, Kenya (Pre-Implementation Report)**

Timeline

 Jun 17 - Team Roles Finalized

* June 24 - Initial Draft of Intro & Project Background 

* July 1 - Review Design w/ Team

*July 15 -Section drafts for review by entire team

*July 29 - Final draft reviewed @ team meeting 

*Aug 5- Section Finals complete & reviewed @ team meeting

*Aug 15 - Report complete ready

*Sept. 5 - Submit report

*Oct. 15 - Respond to inquires

*Jan 13 - UMC EWB leaves for Africa

Team Purpose & Responsibilities

* Project Leader - Tuck Burton

* Secretary - Madison Bondoc 

*Faculty Advisor - Dr. Lee Blaney

*Professional Engineer Mentor - Mr. Duane Wilding

*Chief Editor - Arundhathi 

*Technical Leader - Kiran

*Fundraising Lead - Chris Mullen

*Members/Section Leads - All 

Report SectionResponsibilities

Intro, Project background, Conclusion: Madison Bondoc

*Design: Swarnalatha Balasurbramanian, Sasan Sharee Ghourichaee

*Construction: Ke He, Kiranmayi Mangalgiri, Fabrice Nkodo-Atangana

* Sustainability: Arundthathi Venkatasubraman

*Ownership & Community Agreement/Contract: Mr. Duane Wilding

*Monitoring & Site Ass: Arundhathi Venkatasubraman, Fabrice Nkodo-Atangana, Andrew Bofto

Cost Estimate:

PE Assessment: Mr. Duane Wilding

*Appendices:

* Administrative Information: 

*Budget, Donors, & Funding: 

*Professional Mentor-Resume: Mr. Duane Wilding

Group Discussion

* Review over Assigned sections

     - Sec. 4 Proposed Facilities 

          ~ Different headings:

                - Current water source - Madison

               - Springhead vs Bore hole, Borehole siting  - Madison 

               - Well depth, diameter, (hydraulic consideration) - Sasan, Swarna 

               - Drilled Wells

                    ~ Configuration - Andrew & Ke He 

                    ~ Construction - Andrew & Ke He 

                          * Excavation - Ke

                                 - Drilling rig (rotary drilling, percussion drilling, heavy

                                   duty cable tool)

                                 - Drilling rig components (drill bit, hammer)

                          * Lining/casing - Ke

                                  - Dimension (ex. diameter)

                                  - Material (e.g. plastic casing) 

                          * Concrete cast - Ke 

                                - Closing cap used on the bottom end

                               - Prevent from surface contamination

                               - Discussion on the demission of the sealing 

                          * Well head protection - Andrew

                                - Design personally

                          * Borehole well screens -Andrew

                                - Means of separation 

                   ~ Well disinfection - Tuck 

                   ~ Pumping systems - design calculations -Swarna, Sasan 

                   ~ Pump selection - Kiran 

                          - India Mark vs Afridev Pump installation 

     - Sec. 5 Project Ownership

     - Sec. 9 Community Agreement 

Next Meeting Agenda

* Review Draft of Design and Construction sections

* Go over start of Cost Estimate and Sustainability

* Discuss Ownership and Community Agreement 